Transparency Board
All equipment reports — public view.
Browse publicly visible equipment reports only. Personal identity and sensitive operational details are intentionally hidden.
89
Total reports
80
Awaiting repair
2
Being repaired
7
Repaired
4
Critical
| Ticket | Equipment | Location | Priority | Status | Equipment status | Issue Summary | Submitted |
|---|---|---|---|---|---|---|---|
BEC-2026-000157 |
Ceiling Fan
Uncategorized
|
Annex 2 Campus • Rental Bldg. - GA Bldg. - SHS • GA 201
|
Medium | Awaiting repair | Operational |
hskana
|
Aug 12, 2026
Aug 12, 2026
|
BEC-2026-000156 |
electric fan
Electric Fan
|
Annex 1 Campus • Building 13 - BEC Skills Training Center • BSTC 102
|
Medium | Awaiting repair | Operational |
masakit ang talab boss
|
Aug 12, 2026
Aug 12, 2026
|
BEC-2026-000153 |
Monitor
Uncategorized
|
Annex 1 Campus • Building 13 - BEC Skills Training Center • BSTC Rm Area (Computer Laboratory Area)w
|
Medium | Awaiting repair | Operational |
Lines
|
Aug 11, 2026
Aug 11, 2026
|
BEC-2026-000152 |
Television
Uncategorized
|
Annex 1 Campus • Building 13 - BEC Skills Training Center • BSTC Rm Area
|
Medium | Awaiting repair | Operational |
Naggiglitch
|
Aug 11, 2026
Aug 11, 2026
|
BEC-2026-000151 |
Air Conditioner
Uncategorized
|
Main Campus • Building 1 - Gymnasium • Backstage - Principal's Office Area
|
Medium | Awaiting repair | Operational |
Hindi nalamig nang maayos
|
Aug 11, 2026
Aug 11, 2026
|
BEC-2026-000150 |
aircon2
Air Conditioner
|
Annex 2 Campus • New Building - (Diamond) • Room Area
|
Medium | Awaiting repair | Operational |
umuusok
|
Aug 11, 2026
Aug 11, 2026
|
BEC-2026-000149 |
aircon
Air Conditioner
|
Annex 2 Campus • New Building - (Diamond) • Room Area
|
Medium | Awaiting repair | Operational |
umuusok
|
Aug 11, 2026
Aug 11, 2026
|
BEC-2026-000148 |
Air Conditioner
Uncategorized
|
Main Campus • Building 1 - Gymnasium • Backstage - Principal's Office Area
|
Medium | Being repaired | Operational |
Hakdog ni de castro
|
Aug 11, 2026
Aug 11, 2026
|
BEC-2026-000097 |
Ceiling Fan
Uncategorized
|
Annex 2 Campus • Rental Bldg. - GA Bldg. - SHS • GA 102
|
Medium | Being repaired | Operational |
mahangin sobra
|
Aug 5, 2026
Aug 5, 2026
|
BEC-2026-000101 |
Air Conditioner
Air Conditioner
|
Annex 1 Campus • Building 13 - BEC Skills Training Center • BSTC Rm Area (Computer Laboratory Area)
|
High | Awaiting repair | Retired from inventory |
The aircon in the computer laboratory stopped cooling yesterday afternoon and now blows only warm air. There is also a rattling sound from the outdoor unit. The room becomes very…
|
Aug 3, 2026
Aug 3, 2026
|
BEC-2026-000102 |
Chair
Office Chair
|
Main Campus • Building 3 - Learning Resource Building • Room Area
|
Medium | Awaiting repair | Retired from inventory |
One of the armchairs in Grade 9-Sampaguita has a cracked backrest and the left armrest is loose. A student almost fell backwards when leaning on it.
|
Aug 2, 2026
Aug 2, 2026
|
BEC-2026-000104 |
television
Projector
|
Annex 1 Campus • Building 13 - BEC Skills Training Center • BSTC Rm Area (Computer Laboratory Area)
|
Medium | Being repaired | Retired from inventory |
The smart TV used for demonstration teaching will not turn on. The standby light blinks red three times and stops. It was working last Friday.
|
Jul 30, 2026
Jul 30, 2026
|
Showing 73–84 of 89 reports